Projects Transmission and Distribution Ethiopia Power Transmission

Ethiopia - Power Transmission

Design and construction of first 400 kV transmission lines and substations connecting the new Gilgel Gibe II 420 MW HPP to the Ethiopian grid:

- New 400 kV OHTL connecting Gilgel Gibe II HPP-Sabeta (230 km long)

- New 400 kV OHTL connecting Gilgel Gibe II HPP – Gilgel Gibe I HPP (45 km long)

- About 20 km of 230 kV Double circuit OHTL Connecting the substations Sebeta (old) with Sebeta (New)

- Construction of New 400/230 kV substations of Gilgel Gibe I HPP (new) and Sabeta (new)

- Extension of existing 230 kV substations Sebeta (old) and GG I HPP (old).

 

 

Coming soon - Presto on line